Documents Required for Commercial Permits
This listing indicates the required documentation for each permit.
All permits must be submitted with payment. 2022 PERMIT FEE SCHEDULE
PERMIT REVIEW TIME: PLEASE ALLOW UP TO 30 BUSINESS DAYS FOR REVIEW AND ISSUANCE OF PERMITS
LIST OF INSPECTIONS REQUIRED
LIST OF TOWNSHIP INSPECTORS AND CONTACT INFO ** Contact Inspectors directly for Inspection **
ELECTRICAL INSPECTION AGENCIES
**1 SET OF PLANS IN ELECTRONIC FORMAT PREFERRED FOR TWP. RETENTION
- Plans may be submitted on either a CD or thumb drive
- Plans must be formatted as 1 PDF or 1 PDF per trade. (Plans submitted as 1 PDF per page will be returned)
- Electronic plans must bear the seal/stamp of architect or design professional